Panasonic Servo Motor M7RA15GB4L
We also supply the following spare parts:
129 N610123280AA Flexible Conveyor Station (Mechanical Parts):NPMD
130 N610122572AA Conveyor Station (Mechanical Parts):NPM-D
131 N610123959AA Label (Conveyor Station):NPM-D
132 N610123954AA Main Body/Conveyor L Connection Parts:NPM-D
133 N610123958AA Attachment (Conveyor L/R):NPM-D
134 N610124004AA Flexible Conveyor St (Trannsport Unit) For IPC:NPM-D
135 N610080806AC FA PC kit
136 N610123763AA LNB Station Support Unit (Mechanical Parts):NPMD
137 N610126533AA Flexible conveyor station L control: NPM-D
149 MTKA008659AA Main Body/Conveyor Connection Parts:NPMDX/TT2
138 N610126652AA HUB Unit (Mechanical Parts):NPM-D
139 N610130583AC HUB Unit (Electric Parts):NPM-D
140 N610126653AA Power Unit (Mechanical Parts):NPM-D
141 N610130584AB Power Unit (Electric Parts):NPM-D
142 N610123765AB PDA Support Unit (Mechanical Parts):NPM-D
143 N610101909AB Power supply unit (Feeder and Cart PDA)
Efficient Technology Co.,Ltd provide a full SMT assembly line solutions, including SMT Production Line, SMT Pick and place machine, SMT Stencil Printer, SMT Inspection equipment, SMT Weling equipment, SMT Intelligent Storage System, SMT Automatic Insertion Machine, SMT Peripheral Equipment, SMT Feeders, SMT Nozzles, SMT Spare Parts etc any kind SMT machines you may need, please contact us for more information: WeChat: +8613714564591 Email: sales@efsmt.com
FAQ:
Q: What we can do for you?
A: One-stop SMT Solution Supplier; Reliable SMT Partner.
Q.What is your MOQ requirement for the machine?
A. 1 set moq requirement for the machine.
Q. This is the first i use this kind of machine, is it easy to operate?
A: Provide free training,There are also English manuals or instructional videos to show you how to use the machine.
Q: If the machine has any problem after we receive it, how can we do?
A: Our engineer will help to solve it first, and free parts send to you in machine warranty period.
Q: Do you provide any warranty for the machine?
A: Yes 1 year warranty will be provided for the machine.
Q: What is your payment terms?
A: 30% deposit in advance and 70% balance before shipment.